After countless hours of deisgn, testing materials, prepping the surface, making inserts, and two weeks of “loading” the hull, it was finally time to infuse! We left the hull bagged and vacuum overnight, and the next morning we set up the hoses and the manifold system and opened the first valve… 46 minutes later, we had Hull#1 — and it is perfect!
With a totally sealed system, there were no resign gases to breathe in, and very little waste. This is definitely the way to build a boat.